Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12188/29642
Title: APPLICATION OF THE CONTINUOUS METHOD WITH GANTRY CRANE ON RAILWAY RECONSTRUCTION
Authors: Zafirovski Zlatko
Dimitrijevic Jelena
Biljana Matejević
Marko Milijić
Keywords: Railway reconstruction, Continuous method, Gantry crane, Svrljig Knjaževac
Issue Date: Oct-2021
Conference: XXI INTERNATIONAL SCIENTIFIC CONFERENCE ON CONSTRUCTION AND ARCHITECTURE VSU'2021
Abstract: There are several applicable methods for railway reconstruction. This work presents continuous method with gantry crane on the specific railway route Svrljig-Knjaţevac. It is shown how adaptable continuous method can be in a long gorge with lot of series tunnel-bridge. At great length there were no other approaching roads but railway itself. The route is characteristic, with difficult conditions for machine approach and work. Mentioned method provided good results, but there were some situations that could not be resolved by it. These problems are solved under favour of contractor practise. Other available methods are mention for comparison, with short explanation of their characteristics.
URI: http://hdl.handle.net/20.500.12188/29642
ISBN: 978-954-331-117-0
Appears in Collections:Faculty of Civil Engineering: Conference papers

Files in This Item:
File SizeFormat 
Bugarski kongres.pdf816.05 kBAdobe PDFView/Open
Show full item record

Page view(s)

12
checked on May 3, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.