Анализа на капацитетот за производство на електрична енергија кај повеќеакумулациски водостопански систем
Date Issued
2019-10
Author(s)
Пановска Ф., Митовски С., Петковски Љ
Abstract
According to the Water Master Plan of 1973, in the lower basin of Crna Reka in Mariovo and Tikvesh
regions, construction of three large hydro systems is planned: Chebren, Galishte and Tikvesh – as
furthest down the river. From all three planned, only Tikvesh is build, back in 1969. The hydro system
Tikvesh provides water primarily for irrigation of Tikvesh region, and right downstream from the dam
the powerhouse is located where electricity is produced ever since 1969. Many studies and technical
documentation that prove technical and economy feasibility of this system, has been prepared
throughout the years. In this paper, with implementation of simulation mathematical models, prospective
electricity production is estimated of a complex water resources system in the lower basin of Crna Reka,
by implementing Chebren and Galishte as planned system, and Tikvesh – as the existing one.
regions, construction of three large hydro systems is planned: Chebren, Galishte and Tikvesh – as
furthest down the river. From all three planned, only Tikvesh is build, back in 1969. The hydro system
Tikvesh provides water primarily for irrigation of Tikvesh region, and right downstream from the dam
the powerhouse is located where electricity is produced ever since 1969. Many studies and technical
documentation that prove technical and economy feasibility of this system, has been prepared
throughout the years. In this paper, with implementation of simulation mathematical models, prospective
electricity production is estimated of a complex water resources system in the lower basin of Crna Reka,
by implementing Chebren and Galishte as planned system, and Tikvesh – as the existing one.
File(s)![Thumbnail Image]()
Loading...
Name
p201.pdf
Description
12VSHT2019
Size
1.07 MB
Format
Adobe PDF
Checksum
(MD5):caba16e239c3747292923ec1e5186f68
