APPLICATION OF THE CONTINUOUS METHOD WITH GANTRY CRANE ON RAILWAY RECONSTRUCTION
Date Issued
2021-10
Author(s)
Zafirovski Zlatko
Dimitrijevic Jelena
Biljana Matejević
Marko Milijić
Abstract
There are several applicable methods for railway reconstruction. This
work presents continuous method with gantry crane on the specific railway route
Svrljig-Knjaţevac. It is shown how adaptable continuous method can be in a
long gorge with lot of series tunnel-bridge. At great length there were no other
approaching roads but railway itself. The route is characteristic, with difficult
conditions for machine approach and work. Mentioned method provided good
results, but there were some situations that could not be resolved by it. These
problems are solved under favour of contractor practise. Other available
methods are mention for comparison, with short explanation of their
characteristics.
work presents continuous method with gantry crane on the specific railway route
Svrljig-Knjaţevac. It is shown how adaptable continuous method can be in a
long gorge with lot of series tunnel-bridge. At great length there were no other
approaching roads but railway itself. The route is characteristic, with difficult
conditions for machine approach and work. Mentioned method provided good
results, but there were some situations that could not be resolved by it. These
problems are solved under favour of contractor practise. Other available
methods are mention for comparison, with short explanation of their
characteristics.