Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12188/29796
DC FieldValueLanguage
dc.contributor.authorGacevski Vaskoen_US
dc.contributor.authorLazarevska Marijanaen_US
dc.date.accessioned2024-03-20T09:05:51Z-
dc.date.available2024-03-20T09:05:51Z-
dc.date.issued2024-03-
dc.identifier.isbn9788682707363-
dc.identifier.urihttp://hdl.handle.net/20.500.12188/29796-
dc.description.abstractThe “plan” for the completion of any building is represented by a number of linked plans. Planning is the production of budgets, schedules, and other detailed specifications of the steps to be followed and the constraints to be obeyed in project execution. No matter the type of the project there is always a need for a plan. Construction projects are very complex in nature, so proper planning can ensure that things happen successfully. Modern planning can be implemented in every project stage with logical updating as the project advances. Construction planning can be oriented towards time and costs. These parameters are mutually related, and they should give a general or detailed view of the length of the construction, cash flow and in some cases the risks that may occur. The planning can be done with detailed review of the design with communication with the Investor and Contractor. Nowadays project scheduling and planning is usually done with software solutions which result in Gant charts, network diagrams, linear plans, etc. This paper shows time planning of parallel construction of three buildings, as part of a hotel complex, in Republic of North Macedonia using MS Project. The general purpose and goal of the analysis conducted in this paper is to show that adequate planning can significantly improve the overall construction process, resulting in lowering the total duration of the project, while respecting of the major milestones, smaller investment costs and better insight during the whole construction process.en_US
dc.language.isoenen_US
dc.publisherUNIVERSITY OF MONTENEGRO FACULTY OF CIVIL ENGINEERINGen_US
dc.subjectnetwork planning, parallel construction, MS project, building, technology of constructionen_US
dc.titleAPPLICATION OF NETWORK PLANNING TECHNIQUE IN BUILDING CONSTRUCTIONen_US
dc.typeArticleen_US
dc.relation.conferenceGNPen_US
item.grantfulltextopen-
item.fulltextWith Fulltext-
Appears in Collections:Faculty of Civil Engineering: Conference papers
Files in This Item:
File Description SizeFormat 
APPLICATION OF NETWORK PLANNING TECHNIQUE IN BUILDING CONSTRUCTION.pdf642.75 kBAdobe PDFView/Open
Show simple item record

Page view(s)

69
checked on Jul 18, 2024

Download(s)

20
checked on Jul 18, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.