Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12188/29735
Title: RANKING OF TOTAL TIME RESERVES FOR DETERMINATION OF THE CRITICAL PATH IN FUZZY NETWORK PLAN
Authors: Lazarevska Marijana
Gacevski Vasko
Zafirovski Zlatko
Keywords: Critical path method, fuzzy logic, fuzzy network plan, risk, uncertainty, construction projects, planning, time reserve, ranking, fuzzy numbers.
Issue Date: Mar-2024
Publisher: UNIVERSITY OF MONTENEGRO FACULTY OF CIVIL ENGINEERING
Conference: THE 9th INTERNATIONAL CONFERENCE "CIVIL ENGINEERING – SCIENCE AND PRACTICE"
Abstract: The Critical Path Method, as a method of network planning, is used in the process of planning and control of complex projects from various fields. For their successful implementation, a clear determination of the duration of each project activity is necessary. However, in construction sector it is very difficult to fulfill this requirement, because the realization of many activities is accompanied by a certain degree of uncertainty and risk. Since construction projects are characterized by uniqueness and unrepeatability, there are often no available historical data for a clear and precise determination of the duration of project activities. Given that, the duration should be predicted by expert and experienced persons, who, in the conditions of unique influencing factors and facing many inaccuracies, should define their decisions during the whole process of project management. Due to the shortcomings of classical planning methods, related to the calculation of the duration of project activities, which does not offer the possibility of modeling complex construction projects, there was a real need for the definition and implementation of new concepts of planning. As an alternative way to model uncertainty and risk, the fuzzy concept was introduced in the planning process, with which the durations of project activities are presented through fuzzy numbers. This fundamental approach, which is based on the application of fuzzy theory, enables advanced and successful modelling of real situations and projects, which overcomes the shortcomings characteristic of classical planning methods. This paper gives an overview of one practical example of application of fuzzy logic in the planning process. One method of ranking fuzzy numbers has been applied for calculation of the earliest and the latest fuzzy time of project activities, and the total time reserves, in order to determine the critical path in fuzzy network diagrams.
URI: http://hdl.handle.net/20.500.12188/29735
ISBN: 9788682707363
Appears in Collections:Faculty of Civil Engineering: Conference papers

Files in This Item:
File SizeFormat 
GNP 2024 Proceedings_Zafirovski_4.pdf1.06 MBAdobe PDFView/Open
Show full item record

Page view(s)

31
checked on Apr 26, 2024

Download(s)

6
checked on Apr 26, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.