dc.description.abstractPlanning is essentially a way of mentally presenting projects in the future, and it is implemented through the creation of models (graphical, mathematical, etc.) through which the behaviour of the future real project is simulated in a changing environment. It implies the implementation of analyses with included risk and uncertainty for correct decision-making during the implementation of projects. In modern construction, the realization of any more serious project cannot be imagined without the application of quality planning and management methods. Network models are an example of the most commonly used methods for planning of the implementation of complex and longterm projects. The most commonly used network models in construction are: Critical Path Method (CPM) and the PERT method (Project Evaluation and Review Technique). They are used for analysis of the project time duration, cost and resources. Both methods use a graphical representation of the project through an appropriately oriented network model composed of basic elements such as: activities, events, durations, costs, resources etc. This paper gives an example of the application of Precedence diagramming for planning of a local road reconstruction, as an easy approach for determination of the total time duration of the project that gives a clear overview of the technology of construction in accordance with the general and specific conditions of the project and its environment.en_US
dc.publisherUNIVERSITY OF MONTENEGRO FACULTY OF CIVIL ENGINEERINGen_US
dc.subjectPrecedence diagramming, planning, time analysis, road, reconstruction, network plan, critical path, technology of construction, project activities.en_US
dc.titleAPPLICATION OF PRECEDENCE DIAGRAMMING FOR PLANNING OF A LOCAL ROAD RECONSTRUCTIONen_US
dc.typeProceeding articleen_US
dc.relation.conferenceTHE 9th INTERNATIONAL CONFERENCE "CIVIL ENGINEERING – SCIENCE AND PRACTICE"en_US
item.grantfulltextopen-
item.fulltextWith Fulltext-
Appears in Collections:Faculty of Civil Engineering: Conference papers
Files in This Item:
File Description SizeFormat 
GNP 2024 Proceedings_Zafirovski_3.pdf1.24 MBAdobe PDFView/Open
Show simple item record

Page view(s)

36
checked on May 9, 2024

Download(s)

11
checked on May 9, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.